Sunarmi, Sunarmi (2020) Analisis Perancangan Sistem Informasi Jadwal Kerja Operator pada PT. GS Electech Indonesia. Sarjana (S1) thesis, STIE Tri Bhakti.
|
Text
HALAMAN DEPAN.pdf Restricted to Registered users only Download (2MB) |
|
|
Text
BAB I.pdf Restricted to Registered users only Download (671kB) |
|
|
Text
BAB II.pdf Restricted to Registered users only Download (401kB) |
|
|
Text
BAB III.pdf Restricted to Registered users only Download (341kB) |
|
|
Text
BAB IV.pdf Restricted to Registered users only Download (1MB) |
|
|
Text
BAB V.pdf Restricted to Registered users only Download (211kB) |
|
|
Text
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (228kB) |
Abstract
The purpose of this study was to analyze the production part of PT. GS Electech Indonesia, West Cikarang Regency, which has not combined the evaluation of employee capability, monitoring defect products, and scheduling replacement employees in order to reduce the number of defective products through a flowchart proposal that combines the three things above with the document flow chart analysis method. There are four stages of research.The four stages are (1) Interview, observation and study of literature, (2) Flow chart of employee skills evaluation document, flow chart of defect product monitoring document, employee scheduling flow chart, (3) Proposal of merging document flow, (4) Proposal monitor display and report.
| Item Type: | Thesis (Sarjana (S1)) |
|---|---|
| Uncontrolled Keywords / Kata Kunci: | Document chart analysis, Work Schedule Problems, Corrective, Detective and Peventive. Ms Access |
| Subjects: | Manajemen Manajemen > Manajemen Sumber Daya Manusia Manajemen > Sistem Informasi Manajemen |
| Prodi: | S1 Manajemen |
| Depositing User: | Indah Ekawati |
| Date Deposited: | 25 Jun 2026 05:24 |
| Last Modified: | 25 Jun 2026 05:24 |
| URI: | http://repository.stietribhakti.ac.id/id/eprint/2204 |
Actions (login required)
![]() |
View Item |
